Description
ABB Ability™ smart power plant solutions are also used in one of the largest heavy-duty gas turbine power plants
in China – the Guangzhou Zengcheng 2×660MW gas turbine project. Through local deployment of MyRemoteCare, real-time status information is used
to evaluate the health status of the equipment to achieve predictive maintenance management. It is a member of the Huadian
Group The first power plant project to fully apply a full set of digital solutions; also relying on the ABB Ability™ EAM energy efficiency and
asset health management cloud platform (formerly ABB EDCS), Shandong Guoshun Construction Group Co.,
Ltd., located in the country”s major steel province, not only achieved The intelligent transformation of environmental protection
equipment also established Guoshun Group”s intelligent operation and management platform, opening a new chapter in the
transformation of energy conservation, efficiency improvement, and sustainable development.
In the context of China”s economic growth driving continued growth in energy demand, the structural transformation
of high-carbon energy and the challenges posed to the energy industry by the “dual carbon” goal require that in the power value chain of generation
, transmission, distribution and storage, through intelligent, Digital monitoring, communication and control systems ensure
the reliable operation of the power grid, and at the same time effectively plan the comprehensive deployment and coordinated
operation between the “source, storage and load grid ends” to maximize economic benefits.
ABB Ability™ smart energy management system breaks the previous way of operating in isolated islands of multiple systems
from the power supply side to the power distribution side to the power consumption side, and realizes integrated platform management and mutual
collaborative operation. Through the physical model of the energy Internet, Online measurement data and historical operating
data are used to establish simulation models and conduct sand table deductions in different scenarios to verify the rationality and effectiveness of
different solutions, providing an important basis for optimizing energy solutions in scenarios such as smart buildings and low-carbon parks.
With the establishment of a low-carbon energy system and the cross-border integration and iteration of smart grid, mobile Internet
and other technologies, it has also injected new impetus into the vigorous development of China”s electric vehicle industry. Connect
renewable energy from the energy supply end to create a green and intelligent charging ecosystem. Relying on ABB Ability™
charging infrastructure solutions and management platforms, it can actively monitor status, remotely update software and troubleshoot, and quickly
respond to needs to reduce operation and maintenance costs. At the same time, based on the two major scenarios of household multi-energy
and station charging, reasonable planning of charging demand can further optimize the power grid load curve, perform
peak shaving and valley filling, and achieve orderly charging of charging stations.
In March 2021, the photovoltaic power generation and system integration project of Beijing ABB Low Voltage
Electrical Appliances Co., Ltd. was successfully connected to the grid. The energy-saving solution used integrated the ABB Ability™ EDCS intelligent power distribution contro
l system, charging management platform and electric vehicle charging pile technology. etc., realizing building automation and digital management of the entire factory. As early as 2019, ABB Xinhui Low Voltage Switch Co.
, Ltd. actively carried out digital power distribution transformation. Through the ABB Ability™ EDCS intelligent power distribution control system and the utilization of renewable energy, it achieved an
annual electricity saving of 1 million yuan, providing more ABB users with Provide case
references and useful reference for digital transformation.
Currently, ABB Xiamen Industrial Center Smart Park is implementing an upgrade and construction project to
further explore the application of ABB Ability digital technology and multi-strategy flexible and precise control. It is expected that after completion in the second quarter of 2022,
ABB Xiamen Industrial Center can realize source-grid-load-storage coordinated control of the entire park through the ABB ZEE600 smart energy management platform,
big data AI analysis for load prediction, and the operation of park equipment in different scenarios. Sequential electricity consumption for energy efficiency optimization. After
completion, 40% of electricity will be replaced by clean energy, carbon emissions will be reduced by 15,000 tons, electricity costs will be saved by 20%, and operating costs will be reduced by 40%.
Empowering China’s industrial digital transformation with diverse application scenarios using a century-old capital
Everything in the past is a prologue. ABB, with a history of more than 130 years, is based on innovative technologies
and leading digital solutions. It understands the connotation of digital and translates it into direct actions. It also carries out the “Billions of better decisions” project to
continue to make decisions in the real world. Empowering industry transformation and creating value for users.
Actions speak louder than words, quality speaks louder than appearance. As one of the fastest growing economies in the world, China is an important market for ABB”s
digital solutions. After more than 20 years of rapid development, ABB has provided more than 5 million connected
devices and more than 8,000 control systems to Chinese users, providing ABB with It has laid a solid foundation to support the digital transformation of Chinese customers.
In view of the diversified application scenarios in the Chinese market at this stage, ABB is committed to continuously
increasing the digital transformation of the industry. It is particularly worth mentioning that the localized version of the ABB
Ability™ digital platform based on Huawei Cloud was successfully released in China in 2020, which will continue to
promote more ABB digital solutions to be implemented on Huawei Cloud in China, providing more services to meet the needs of the Chinese market. Choice and flexibility.
ABB also fully develops products from the perspective of Chinese users, responds more effectively to the digital transformation process of China”s
industry through one-stop digital services, and vigorously fulfills its firm commitment to writing a safe, smart and sustainable electrified future!
Excitation system ABB module XVC770BE101 3BHE021083R0101
Excitation system ABB module XVC770BE101 3BHE021083R0101
Excitation system ABB module XVC770BE101
Excitation system ABB module XVC770AE 3BHE006414R0001
Excitation system ABB module XVC770AE 3BHE006414R0001
Excitation system ABB module XVC769AE101 3BHE006373R0101
Excitation system ABB module XVC769AE101 3BHE006373R0101
Excitation system ABB module XVC769AE101 3BHE006373R0101
Excitation system ABB module XVC769AE101
Excitation system ABB module XVC769AE101
Excitation system ABB module XVC768AE117 3BHB007211R0117
Excitation system ABB module XVC768117 3BHB007211R117
Excitation system ABB module XVC768115 3BHB7211R115
Excitation system ABB module XVC768115 3BHB007211R115
Excitation system ABB module XVC768106 3BHB007211R106
Excitation system ABB module XVC768102 3BHB007211R102
Excitation system ABB module XVC768101 3BHB007211R101
Excitation system ABB module XVC767AE105 3BHB007209R0105
Excitation system ABB module XVC767AE105 3BHB007209R0105
Excitation system ABB module XVC767AE102 3BHB007209R0102
Excitation system ABB module XVC767AE102 3BHB007209R0102
Excitation system ABB module XVC724BE101 3BHE009017R0101
Excitation system ABB module XVC724BE101 3BHE009017R0101
Excitation system ABB module XVC724BE 3BHE009017R0102
Excitation system ABB module XVC722AE101 3BHB002751R0101
Excitation system ABB module XV9738a HEIE450617R
Excitation system ABB module XV9738a
Excitation system ABB module XTB750B01 HUCD420038R0001 HIEE440503P201
Excitation system ABB module XS321A-E
Excitation system ABB module XS321A
Excitation system ABB module XO08R2 1SBP260109R1001
Excitation system ABB module XO08R2 1SBP260109R1001
Excitation system ABB module XO08R2 1SBP260109R1001
Excitation system ABB module XO08R2
Excitation system ABB module XM06B5
Excitation system ABB module XI16E1
Excitation system ABB module VPM810
Excitation system ABB module VPM810
Excitation system ABB module VCD-02 3HNA006565-001
Excitation system ABB module VBX01T-VBX01B
Excitation system ABB module VBX01T-VBX01B
Excitation system ABB module VBX01TA
Excitation system ABB module VBX01TA
Excitation system ABB module VBX01BA
Excitation system ABB module VBX01BA
Excitation system ABB module VBS01-EPD
Excitation system ABB module VBS01
Excitation system ABB module V4550202-0100
Excitation system ABB module V17152-310
Excitation system ABB module V17152-310
Excitation system ABB module V17111-110
Excitation system ABB module UUD148AE02 3BHE014185R0002
Excitation system ABB module UUD148AE02
Excitation system ABB module UUD148AE01 3BHE014185R0001
Excitation system ABB module USC329AE01-1 3BHB002483R0001
Excitation system ABB module USC329AE01 3HB002483R0001
Excitation system ABB module USC329AE01 3BHB002483R0001
Excitation system ABB module USC329AE01
Excitation system ABB module UPC325AE01 3BHB000644R0001
Excitation system ABB module UNS4881b,V4 3BHE009949R0004
Excitation system ABB module UNS3670A-Z,V2 HIEE205011R0002
Excitation system ABB module UNS3020 HIEE205010R0003
Excitation system ABB module UNS3020 HIEE205010R0001
Excitation system ABB module UNS2980c-ZV4
Excitation system ABB module UNS2882A 3BHE003855R0001
Excitation system ABB module UNS2882A
Excitation system ABB module UNS2881B-PV1
Excitation system ABB module UNS2881b-P,V1 3BHE009319R0001
Excitation system ABB module UNS2880b-P,V2 3BHE014967R0002
Excitation system ABB module UNS2880B-P,V1
Excitation system ABB module UNS2880B-P
Excitation system ABB module UNS0887A-P 3BHE008128R0001
Excitation system ABB module UNS0885A-ZV1
Excitation system ABB module UNS0885a-Z V1 3BHB006943R0001
Excitation system ABB module UNS0884A-V1
Excitation system ABB module UNS0883a-P,V1
Excitation system ABB module UNS0881a-P,V1 3BHB006338R0001
Excitation system ABB module UNS0880a-P,V1
Excitation system ABB module UNS0874A
Excitation system ABB module UNS0868A-P HIEE305120R2
Excitation system ABB module UNS0867 A-P V2
Excitation system ABB module UNS0862A HIEE405179R0001
Excitation system ABB module UNS0122A-P
Excitation system ABB module UNS0119A-P,V101
Excitation system ABB module UNS0017A-P HIER464920P0001
Excitation system ABB module UNS0007A-PV1 HIEE305098R0001 HIEE410730P201
Excitation system ABB module UNS0007A-PV1
Excitation system ABB module UNITROL5000 3BHE017671R5000
Excitation system ABB module UNITROL1020
Excitation system ABB module UNITROL1010
Excitation system ABB module UNITROL1000 B-Z V104 3BHE014557R6104