Sale!

IS215UCVHM06A Reliable Turbine Control Solutions

Original price was: $1,888.00.Current price is: $1,688.00.

МодельIS215UCVHM06A

Первоначальная гарантия на один год.
IS215UCVHM06A Параметры

IS215UCVHM06A Размер 30 * 20 * 30
IS215UCVHM06A Вес 2 кг

Контактное лицо: г – н Рай

WeChat: 17750010683

WhatsApp: + 86 177500 10683

Электронная почта 3221366881@qq.com

Category:

Description

IS215UCVHM06A Reliable Turbine Control Solutions
IS215UCVHM06A Reliable Turbine Control Solutions
IS215UCVHM06A Reliable Turbine Control Solutions Product details:

IS215UCVHM06A Technical Manual

IS215UCVHM06A Weight:1.8KG
IS215UCVHM06A Size: 20* 20 * 10cm
IS215UCVHM06A instructions
IS215UCVHM06A PDF
IS215UCVHM06A  – это панель связи возбудителя для передачи данных между контроллерами.
666666 Описание функций
ISBus – это защищенный интерфейс связи GE, используемый для передачи данных между контроллерами M1, M2 и C возбудителя. EISB – это модуль с одним слотом и высотой 3U, расположенный в раме управления под DSPX.
IS215UCVHM06A  Сигналы тока и напряжения от магнитного поля генератора (включая, при необходимости, возбудитель) принимаются через волоконно – оптический разъем на передней панели и передаются в модуль обнаружения заземления.
Применение данных
У EISB нет светодиодных индикаторов, трамплинов или предохранителей.
Соединитель
Следующие волоконно – оптические разъемы расположены на передней панели платы и используются для приема и передачи сигналов преобразования частоты IS215UCVHM06A :
• Ввод напряжения постоянного тока на месте для генераторов с пластиной EDCF
• Ввод тока на панели EDCF в аэропорту постоянного тока
Ввод напряжения возбудителя EDCF (необязательно)
Ввод тока в возбудитель EDCF (необязательно)
• Ввод напряжения в детектор заземления
• Переключатель сброса напряжения на выходе из приемника заземления также вогнут за отверстие в нижней части передней панели
Contact person: Mr. Lai
Mobil:17750010683
WeChat:17750010683
WhatsApp:+86 17750010683

BYD, Daimler and ABB will build the world”s largest electric vehicle fast charging network
[Abstract] BYD revealed yesterday that it will build the world”s largest electric vehicle fast charging network with the world”s top 500 ABB and the world”s
automotive giant Daimler of Germany .
BYD revealed yesterday that it will build the world”s largest electric vehicle fast charging network with ABB, a Fortune 500 company, and Germany”s Daimler, the world”s
automotive giant . According to the strategic cooperation agreement, ABB will provide DC fast charging piles to the former in the next six years. China will become the
global leader in fast charging of electric vehicles.

ABB is a leading company in the field of power and automation technology among the world”s top 500 companies. The wall-mounted charging piles it provides to Shenzhen
BYD Daimler New Technology Co., Ltd. adopt a series of innovative designs that are user-friendly, safe and reliable. , which includes a mobile application that allows car
owners to remotely monitor the charging status of their vehicles and receive relevant prompts. The first batch of products will be delivered starting in mid-2014 and will be
sold in conjunction with electric vehicles through the DENZA dealer network.

Three years ago, BYD jointly established Shenzhen BYD Daimler New Technology Co., Ltd. (BDNT) with the world”s luxury car and commercial vehicle manufacturing
giant Daimler of Germany. It focuses on the research and development of new energy vehicle technology and is committed to becoming China”s most successful new
company. Energy vehicle manufacturers promote the development and progress of new energy vehicles. DENZA”s first pure electric vehicle will have its world premiere
at the 2014 Beijing Auto Show.

ABB electric vehicle fast charging solution is expected to be promoted in China

Electric vehicles, which focus on new energy concepts , are making waves again. The electric vehicle fast charging network technology developed by global
power and automation giant ABB of Switzerland is expected to be promoted in the Chinese market. Some analysts believe that ABB”s technology has epoch-making
significance for the new energy vehicle industry.

It is understood that the biggest technical bottleneck of electric vehicles at present is the long charging time. ABB”s technology can reduce the charging time
of electric vehicles from 8 hours to 15 to 30 minutes.

Schriger, head of market and customer solutions for ABB Group, said that recently, ABB has built the world”s first national electric vehicle charging network in
Estonia. The country has set up 165 fast charging stations on highways and urban areas. The piles are located all over the country”s urban areas and main roads, and can
complete the charging of the entire vehicle in a short time, which is far less time-consuming than traditional charging methods.

ABB invests in Guangdong to build the world”s largest medium-voltage transformer production base
The construction of smart grids in the world is in full swing, and the construction of smart grids in China has also achieved rapid development. This has led to the
development of many related instrumentation industries, and the transformer market is one of them. Based on China”s transformer market demand and good development
prospects, ABB recently built the world”s largest medium-voltage transformer production base in Guangdong.

It is reported that ABB, a Fortune 500 company and a leader in power and automation technology, has been committed to increasing energy efficiency, improving
industrial productivity and grid stability. It recently established a joint venture with Guangdong Sihui ABB Transformer Co., Ltd. with Guangdong Sihui Transformer Factory Co., Ltd.

Through advanced technology research and development and combined with the needs of the Chinese market, ABB has developed products that are both
high-standard and localized. The combination of the two will not only inject new vitality into the medium-voltage transformer market and promote the
development of smart grids , but also integrate China”s transformers with international standards and
gradually move towards the global transformer market. It is understood that the new company plans to have a very high annual output, aiming to build the
company into ABB “s largest transformer production base in the world, while meeting domestic and export needs.

3500/25 149369-01 BENTLY vibration monitoring system
3500/93  135785-01 BENTLY overspeed protection module
3500/92-02-01-00 BENTLY overspeed protection module
106M1079-01 BENTLY vibration monitoring system
3500/93 135785-01 BENTLY4 Channel Relay Module
3500/22M 146031-01 BENTLY vibration monitoring system
3500/42M 176449-02 Transient Data Interface BENTLY
3500/40M 176449-01 BENTLY overspeed protection module
3500/20 125744-01 BENTLY vibration monitoring system
128277-01 Temperature monitor BENTLY
3500/33 149986-01 Transient Data Interface BENTLY
128277-01 Transient Data Interface BENTLY
3500/05-01-01-01-00-00 Temperature monitor BENTLY
146031-01 Transient Data Interface BENTLY
3500/15-05-05-00 BENTLY vibration monitoring system
3500/92-02-01-00 BENTLY vibration monitoring system
140471-01 Temperature monitor BENTLY
3500/92 136180-01 Temperature monitor BENTLY
3500/62-03-00 BENTLY vibration monitoring system
3500/15 127610-01 BENTLY overspeed protection module
3500/22M 146031-01 Transient Data Interface BENTLY
3500/15 106M1081-01 Temperature monitor BENTLY
133442-01 BENTLY overspeed protection module
3500/22M 288055-01 BENTLY overspeed protection module
125800-01 BENTLY4 Channel Relay Module
135489-01 BENTLY4 Channel Relay Module
3500/53 133396-01 Transient Data Interface BENTLY
125680-01 BENTLY vibration monitoring system
3500/22M 288055-01 Transient Data Interface BENTLY
3500/42M 135489-01 BENTLY vibration monitoring system
3701/55-01-01 BENTLY4 Channel Relay Module
3500/15 127610-01 BENTLY vibration monitoring system
3500/15 127610-01 Transient Data Interface BENTLY
3500/05-01-01-01-00-00 BENTLY overspeed protection module
125720-01 BENTLY vibration monitoring system
3500/93 135785-02 Transient Data Interface BENTLY
3500/53 133396-01 BENTLY overspeed protection module
3500/15 127610-01 BENTLY overspeed protection module
3500/15 106M1079-01 Temperature monitor BENTLY
3500/05-01-02-00-00-01 BENTLY vibration monitoring system
3500/15 125840-01 Temperature monitor BENTLY

Reviews

There are no reviews yet.

Be the first to review “IS215UCVHM06A Reliable Turbine Control Solutions”

Your email address will not be published. Required fields are marked *