Sale!

IS200ESYSH3A GE Steam Turbine System

Original price was: $1,888.00.Current price is: $1,688.00.

МодельIS200ESYSH3A

Первоначальная гарантия на один год.
IS200ESYSH3A Параметры

IS200ESYSH3A Размер 30 * 20 * 30
IS200ESYSH3A Вес 2 кг

Контактное лицо: г – н Рай

WeChat: 17750010683

WhatsApp: + 86 177500 10683

Электронная почта 3221366881@qq.com

Category:

Description

IS200ESYSH3A GE Steam Turbine System
IS200ESYSH3A GE Steam Turbine System
IS200ESYSH3A GE Steam Turbine System Product details:

IS200ESYSH3A Technical Manual

IS200ESYSH3A Weight:1.8KG
IS200ESYSH3A Size: 20* 20 * 10cm
IS200ESYSH3A instructions
IS200ESYSH3A PDF
IS200ESYSH3A  – это панель связи возбудителя для передачи данных между контроллерами.
666666 Описание функций
ISBus – это защищенный интерфейс связи GE, используемый для передачи данных между контроллерами M1, M2 и C возбудителя. EISB – это модуль с одним слотом и высотой 3U, расположенный в раме управления под DSPX.
IS200ESYSH3A  Сигналы тока и напряжения от магнитного поля генератора (включая, при необходимости, возбудитель) принимаются через волоконно – оптический разъем на передней панели и передаются в модуль обнаружения заземления.
Применение данных
У EISB нет светодиодных индикаторов, трамплинов или предохранителей.
Соединитель
Следующие волоконно – оптические разъемы расположены на передней панели платы и используются для приема и передачи сигналов преобразования частоты IS200ESYSH3A :
• Ввод напряжения постоянного тока на месте для генераторов с пластиной EDCF
• Ввод тока на панели EDCF в аэропорту постоянного тока
Ввод напряжения возбудителя EDCF (необязательно)
Ввод тока в возбудитель EDCF (необязательно)
• Ввод напряжения в детектор заземления
• Переключатель сброса напряжения на выходе из приемника заземления также вогнут за отверстие в нижней части передней панели
Contact person: Mr. Lai
Mobil:17750010683
WeChat:17750010683
WhatsApp:+86 17750010683

Shandong”s policies are more specific. In addition to financial incentives, land supply, tax incentives,
etc., it also mentions improving the first (set) of major technical equipment research and development
and market promotion support policies, and accelerating independent innovation and industrialization of
high-end products. Encourage provincial equity investment guidance
funds to tilt towards the high-end equipment field, give full play to the leverage and amplification effect
of fiscal funds, and attract
and leverage social capital to increase investment.

How can local governments effectively support high-end manufacturing?

Analysts believe that when formulating development plans for high-end manufacturing, local governments
must first conduct thorough research and research on the industry,
find a development path that suits them, and formulate policies that suit the laws of industrial development
. For example, Chongqing has a developed automobile industry, Shanghai has a strong industrial foundation
in large aircraft, chips and robot manufacturing, and Shandong has a
certain technical foundation in marine engineering equipment and rail transit equipment. We should leverage
our strengths and avoid weaknesses and formulate policies based on local conditions.

Second, local policies should not pursue automation and intelligence one-sidedly and support a number
of face-saving projects that are blooming everywhere. For example, in the past two years, my country”s robot industrial
parks have blossomed all over the country, and local governments have used subsidies and tax incentives to
support a number of low-end, small and weak “intelligent manufacturing” robot industries.

Third, local governments’ understanding of high-end manufacturing needs to be further deepened, and
automation cannot simply be equated with high-end manufacturing. Local governments use subsidies to
guide companies to purchase high-end automation equipment, but companies must also use good technology instead of expensive technology
based on actual conditions. The case of Tesla’s over-reliance on automation causing a production capacity
crisis should be taken seriously.

Fourth, neither local governments nor enterprises can rely solely on buying and selling to promote high-end
manufacturing. The government should guide and encourage technological innovation and seek long-term development.

Generally speaking, enterprises should be closer to the market in terms of their own development and industry
needs, and the government should create a policy environment more conducive to enterprise innovation, such
as tax cuts, streamlining administration and delegating powers, etc., to help enterprises reduce costs as much
as possible and give them the greatest benefits.
Expansion capacity.

WOODWARD 8440-2116 Connection unit
WOODWARD 8440-1713/D Synchronizer SPM-D
8440-1546/H Woodward Msp Controller
5302-MBP-MCM4 Modbus Master/Slave Gateway
Triconex 3720 Analog Input Module
2364-SPM03A Main control PCB
1794-ASB FLEX I/O Modules
1756-EN2TXT Communication module
1407-CGCM Combination Generator Control Module
70PR05B-ES HESG332204R0001 Programmable Processor
216EA62 1MRB150083R1/F 1MRB178066R1/F Analog Input unit
60M100-00 Wind turbine detector
New 8BVI0028HWDS.000-1 inverter module
Buy 07AC91 GJR5252300R0101 Analog I/O module
5X00489G01 Power Distribution Module |  Fresh spot
1C31181G01 Remote I/O Module
UDD406A 3BHE041465P201 control unit | Xiongba spare parts
UCD240A101 3BHE022287R010 DC/DC Converter
UAD206A101 3BHE019958R0101 DC/DC Converter  | Xiongba spare parts
TE 1605341-VER02 1605340-05  |  Warranty 1 year
TB711F 3BDH000365R0001 CPU Terminal Base | Xiongba spare parts
SLS1508 KJ2201X1-BA1 12P3162X212 logic solver | Xiongba spare parts
SD812F 3BDH000014R1 SD 812F Power Supply 24 VDC |  Warranty 1 year
SCYC55830 58063282A  interface module | Xiongba spare parts
REF615C-D HCFCACABANB2BAN1XD protective device  |  Warranty 1 year
PTQ-PDPMV1 network interface module | Xiongba spare parts
PR9376/010-011 Magnetic speed sensor |  Warranty 1 year
PPE091A101 Drive Processor Module | Xiongba spare parts
PM783F U3BDH000364R0001 Central Processing Unit|  Warranty 1 year
PM511V16 3BSE011181R1 Processor Module | Xiongba spare parts
PFTL101A 1.0KN 3BSE004166R1 Load cell |  Warranty 1 year
PDD500A101 3BHE037649R0101 |  Warranty 1 year
PDD205A1121 3BHE025335R1121 Digital discrete output module | Xiongba spare parts
SD802F-3BDH000012R1 power module | Xiongba spare parts
NF93A-2 HESG440280R2 HESG323662R1 |  Warranty 1 year
AM811F-3BDH000050R1 S800 communication card | Xiongba spare parts
MC91 HESG440588R4 HESG112714/B |  Warranty 1 year
AM801F 3BDH000040R1 S800 communication card | Xiongba spare parts
TTH300 Temperature Transmitter  | Xiongba spare parts
KJ3242X1-BK1 S-Series Fieldbus H1 Card |  Warranty 1 year
EI813F-3BDH000022R1 ethernet module | Xiongba spare parts

Reviews

There are no reviews yet.

Be the first to review “IS200ESYSH3A GE Steam Turbine System”

Your email address will not be published. Required fields are marked *