Sale!

3BHE009681R0101 DCS excitation system ABB

Original price was: $1,888.00.Current price is: $1,688.00.

Model:3BHE009681R0101

New original warranty for one year

Brand: Honeywell

Contact person: Mr. Lai

WeChat:17750010683

WhatsApp:+86 17750010683

Email: 3221366881@qq.com

Category:

Description

3BHE009681R0101 DCS excitation system ABB
3BHE009681R0101 DCS excitation system ABB
3BHE009681R0101 DCS excitation system ABB Product details:
3BHE009681R0101 is an interface communication module from ABB, with product model 3BHE009681R0101. This module is commonly used in industrial automation systems,
especially in the field of process control. Here are some possible application and product operation areas:
Industrial automation: Th3BHE009681R0101 communication module may be used to communicate with other automation equipment, control systems,
or sensors to achieve automation and integration of industrial production lines.
Process control: This module may be used to monitor and control various processes, such as chemical plants, power plants, pharmaceutical plants,
etc. Through communication with other devices, it can achieve data exchange and control instruction transmission.
PLC (Programmable Logic Controller) system3BHE009681R0101 may be integrated into the PLC system for communication with other PLC modules or
external devices, achieving centralized management of the entire control system.
Data collection and monitoring: In the data collection system3BHE009681R0101 can be used to obtain data from various sensors and devices,
and transmit this data to the monitoring system for real-time monitoring and analysis.
Remote monitoring and operation: Through collaborative work with other communication modules3BHE009681R0101 may support remote monitoring and operation,

allowing operators to monitor and control the production process from different locations.

Contact person: Mr. Lai
Mobil:17750010683
WeChat:17750010683
WhatsApp:+86 17750010683

BYD, Daimler and ABB will build the world”s largest electric vehicle fast charging network
[Abstract] BYD revealed yesterday that it will build the world”s largest electric vehicle fast charging network with the world”s top 500 ABB and the world”s
automotive giant Daimler of Germany .
BYD revealed yesterday that it will build the world”s largest electric vehicle fast charging network with ABB, a Fortune 500 company, and Germany”s Daimler, the world”s
automotive giant . According to the strategic cooperation agreement, ABB will provide DC fast charging piles to the former in the next six years. China will become the
global leader in fast charging of electric vehicles.

ABB is a leading company in the field of power and automation technology among the world”s top 500 companies. The wall-mounted charging piles it provides to Shenzhen
BYD Daimler New Technology Co., Ltd. adopt a series of innovative designs that are user-friendly, safe and reliable. , which includes a mobile application that allows car
owners to remotely monitor the charging status of their vehicles and receive relevant prompts. The first batch of products will be delivered starting in mid-2014 and will be
sold in conjunction with electric vehicles through the DENZA dealer network.

Three years ago, BYD jointly established Shenzhen BYD Daimler New Technology Co., Ltd. (BDNT) with the world”s luxury car and commercial vehicle manufacturing
giant Daimler of Germany. It focuses on the research and development of new energy vehicle technology and is committed to becoming China”s most successful new
company. Energy vehicle manufacturers promote the development and progress of new energy vehicles. DENZA”s first pure electric vehicle will have its world premiere
at the 2014 Beijing Auto Show.

ABB electric vehicle fast charging solution is expected to be promoted in China

Electric vehicles, which focus on new energy concepts , are making waves again. The electric vehicle fast charging network technology developed by global
power and automation giant ABB of Switzerland is expected to be promoted in the Chinese market. Some analysts believe that ABB”s technology has epoch-making
significance for the new energy vehicle industry.

It is understood that the biggest technical bottleneck of electric vehicles at present is the long charging time. ABB”s technology can reduce the charging time
of electric vehicles from 8 hours to 15 to 30 minutes.

Schriger, head of market and customer solutions for ABB Group, said that recently, ABB has built the world”s first national electric vehicle charging network in
Estonia. The country has set up 165 fast charging stations on highways and urban areas. The piles are located all over the country”s urban areas and main roads, and can
complete the charging of the entire vehicle in a short time, which is far less time-consuming than traditional charging methods.

ABB invests in Guangdong to build the world”s largest medium-voltage transformer production base
The construction of smart grids in the world is in full swing, and the construction of smart grids in China has also achieved rapid development. This has led to the
development of many related instrumentation industries, and the transformer market is one of them. Based on China”s transformer market demand and good development
prospects, ABB recently built the world”s largest medium-voltage transformer production base in Guangdong.

It is reported that ABB, a Fortune 500 company and a leader in power and automation technology, has been committed to increasing energy efficiency, improving
industrial productivity and grid stability. It recently established a joint venture with Guangdong Sihui ABB Transformer Co., Ltd. with Guangdong Sihui Transformer Factory Co., Ltd.

Through advanced technology research and development and combined with the needs of the Chinese market, ABB has developed products that are both
high-standard and localized. The combination of the two will not only inject new vitality into the medium-voltage transformer market and promote the
development of smart grids , but also integrate China”s transformers with international standards and
gradually move towards the global transformer market. It is understood that the new company plans to have a very high annual output, aiming to build the
company into ABB “s largest transformer production base in the world, while meeting domestic and export needs.

Excitation system ABB module 3HNA024871-001
Excitation system ABB module 3HNA024203-001
Excitation system ABB module 3HNA023282-001
Excitation system ABB module 3HNA023200-001
Excitation system ABB module 3HNA018573-001
Excitation system ABB module 3HNA018564-001
Excitation system ABB module 3HNA016493-001
Excitation system ABB module 3HNA015771-001
Excitation system ABB module 3HNA015495-001/01
Excitation system ABB module 3HNA015162-001
Excitation system ABB module 3HNA015149-001
Excitation system ABB module 3HNA015149-001
Excitation system ABB module 3HNA013638-001/03
Excitation system ABB module 3HNA012283-001
Excitation system ABB module 3HNA011999-001
Excitation system ABB module 3HNA011788-001/01
Excitation system ABB module 3HNA011334-001
Excitation system ABB module 3HNA011334-001
Excitation system ABB module 3HNA011333-001
Excitation system ABB module 3HNA010906-001
Excitation system ABB module 3HNA010598-001/03
Excitation system ABB module 3HNA010598-001 DSQC378B
Excitation system ABB module 3HNA009724-001
Excitation system ABB module 3HNA009609-001
Excitation system ABB module 3HNA007885-002
Excitation system ABB module 3HNA007719-001
Excitation system ABB module 3HNA007073-001/03
Excitation system ABB module 3HNA007022-001
Excitation system ABB module 3HNA007022-001
Excitation system ABB module 3HNA007022
Excitation system ABB module 3HNA006570-001
Excitation system ABB module 3HNA006492-001/04
Excitation system ABB module 3HNA006330-001
Excitation system ABB module 3HNA006262-001
Excitation system ABB module 3HNA006149-001
Excitation system ABB module 3HNA006149-001
Excitation system ABB module 3HNA006146-001
Excitation system ABB module 3HNA006145-001
Excitation system ABB module 3HNA006144-001/03
Excitation system ABB module 3HNA006144-001/03
Excitation system ABB module 3HNA006144-001
Excitation system ABB module 3HNA004958-001
Excitation system ABB module 3HNA002064-001
Excitation system ABB module 3HNA001625-001
Excitation system ABB module 3HNA001625-001
Excitation system ABB module 3HNA000512-001
Excitation system ABB module 3HB012961R0001
Excitation system ABB module 3HAC9710-1
Excitation system ABB module 3HAC8627-1
Excitation system ABB module 3HAC8593-1
Excitation system ABB module 3HAC8500-6
Excitation system ABB module 3HAC8409-1
Excitation system ABB module 3HAC8311-2
Excitation system ABB module 3HAC8280-1
Excitation system ABB module 3HAC8278-1/04
Excitation system ABB module 3HAC8185-4
Excitation system ABB module 3HAC8085-2
Excitation system ABB module 3HAC7998-8
Excitation system ABB module 3HAC7998-7
Excitation system ABB module 3HAC7970-1
Excitation system ABB module 3HAC7681-1
Excitation system ABB module 3HAC7681-1
Excitation system ABB module 3HAC7664-1
Excitation system ABB module 3HAC7457-3
Excitation system ABB module 3HAC7344-1
Excitation system ABB module 3HAC7344-1
Excitation system ABB module 3HAC7310-1
Excitation system ABB module 3HAC7149-1
Excitation system ABB module 3HAC6877-1
Excitation system ABB module 3HAC6792-1
Excitation system ABB module 3HAC6762-1
Excitation system ABB module 3HAC6696-1
Excitation system ABB module 3HAC6449-1

Reviews

There are no reviews yet.

Be the first to review “3BHE009681R0101 DCS excitation system ABB”

Your email address will not be published. Required fields are marked *