Sale!

3BHB021400R0002 Контроллер ABB

Original price was: $1,888.00.Current price is: $1,688.00.

Модель3BHB021400R0002

Первоначальная гарантия на один год.
3BHB021400R0002 Параметры

3BHB021400R0002 Размер 30 * 20 * 30
3BHB021400R0002 Вес 2 кг

Контактное лицо: г – н Рай

WeChat: 17750010683

WhatsApp: + 86 177500 10683

Электронная почта 3221366881@qq.com

Category:

Description

3BHB021400R0002 Контроллер ABB
3BHB021400R0002 Контроллер ABB
3BHB021400R0002 Контроллер ABB Product details:

3BHB021400R0002 Technical Manual
3BHB021400R0002 instructions
3BHB021400R0002 PDF
3BHB021400R0002 Weight:1.8KG
3BHB021400R0002 Size: 20* 38 * 30cm
3BHB021400R0002Основанная в 1988 году, Asibronbrfary Corporation (ABB) является известной крупной швейцарской многонациональной компанией со штаб – квартирой в Цюрихе,
Швейцария, и входит в десятку крупнейших швейцарских транснациональных корпораций.3BHB021400R0002
Компания Accibronburfary является одной из крупнейших в мире компаний, производящих промышленные, энергетические и автоматизированные продукты. перерабатывающая промышленность:
химическая, нефтехимическая, фармацевтическая, целлюлозно – бумажная, нефтепереработка; Оборудование приборов: электронные приборы, телевизоры и оборудование для передачи данных,
генераторы, гидротехнические сооружения; Каналы связи: интегрированные системы, системы сбора и распространения;3BHB021400R0002Строительная промышленность: коммерческое и промышленное строительство.
В период с 2015 по 2016 год объем продаж компании Axibronburfary достиг 32 миллиардов долларов. На фондовых биржах Цюриха, Стокгольма и Нью – Йорка.
Contact person: Mr. Lai
Mobil:17750010683
WeChat:17750010683
WhatsApp:+86 17750010683

Practical application of ABB industrial information control system 800xA in main shaft hoist control
introduction

The mine hoist is an important transportation equipment for mining enterprises. Its main function is to transport the ore,
personnel or equipment that need to be transported to the destination by the lifting container. Therefore, it plays a very
important role in the mining production process. Usually the mine hoist control system consists of a driving part and a
control part. The working mechanism
of the driving part is: the motor unit drives the mechanical hoisting device, and the frequency converter or other types
of hoisting control systems drive the motor unit: the working mechanism of the control part is: Each component of the
hoist is coordinated and controlled by the
Distributed Control System (DCS). In addition to completing basic process control, it can also integrate intelligent instruments,
intelligent transmission and motor control, and even production management and safety systems into one operation and engineering environment
middle. Therefore, the mine hoist requires a control system with high performance, high reliability, and high integration.

1ABB800xA system and AC800M controller introduction

1.1ABB800xA system introduction

The 800xA system is an industrial information control system launched by ABB. The core of its architecture is
object-oriented (ObjectOriented) technology. Due to the adoption of ABB”s unique Aspect0object concept,
enterprise-level information access, object navigation and access can become standardized and simple.

In order to provide a unified information platform for enterprise managers and technical personnel, the 800xA system
provides a base platform (BasePlatform), which relatively separates the process control part and production control
management and organically combines them together. As shown in Figure 1, the middle part is the basic platform, the upper part is the production control
management part, and the lower part is the process control part. The basic platform provides standard interfaces for
these two parts for data exchange.
1.2 Introduction to ABBAC800M controller and its programming configuration tools

AC800M controller is ABB”s latest controller series, which includes a series of processors from PM851 to PM865.
The AC800M controller itself has a pair of redundant TCP/IP interfaces. It can use the MMs protocol to communicate
with other control devices and 800xA operator stations through Ethernet. It can also use the Modbus protocol and
Point-Point protocol through 2 serial ports. communication. The programming and configuration tool of AC800M is
ControlBuilderM,
referred to as CBM. It supports standard ladder diagram, function block language, text description
language and assembly language to write control logic.

2. Improve the design and implementation of control system functions

2.1 Implementation of elevator operating speed curve

One of the main tasks of the lifting control system is to control the lifting motor to operate according to the speed-position
curve given by the design, so that the lifting container passes through the acceleration section, the uniform speed
section and the deceleration section successively, and stops accurately after completing the specified lifting distance
. somewhere in the wellbore. In order to realize the function of precise position calculation, the designed
elevator control system must be able to perform high-precision position calculation based on the photoelectric encoder
connected to the main shaft of the elevator drum. The
calculation formula is as follows:
In the formula, s is the actual position value of the elevator: sp is the distance corresponding to two consecutive encoder
pulses: AN is the difference between the encoder count value at the reference position and the current position (signed variable):
s0 is the reference position value.

The encoder counts are distributed according to the circumference of the drum. After the number of pulses Np generated
by the encoder rotation is known, the diameter of the circumference of the centerline of the wire rope wrapped around the
drum must be accurately known, so that it can be calculated according to formula (2) The distance sp corresponding to the two encoder pulses:
In the formula, D is the circumferential diameter of the centerline of the wire rope: Np is the number of pulses for one revolution of the known encoder.

But in formula (2), there is a value D that keeps getting smaller as the system runs. This is because the wire rope
used in the elevator is wrapped around the drum, and there is a lining between the wire rope and the drum that increases
friction. This liner will become thinner and thinner as the system continues to wear and tear, causing the diameter of the
circle formed by the center line of
the steel wire rope to gradually become smaller. When the pad wears to a certain extent, it will cause a large position
calculation error. In order to solve the above problems, the two parking position switches in the shaft are used to correct the drum diameter, because the
distance between the two parking positions can be obtained through actual measurement with high accuracy. During the
actual operation, record the encoder count values ​​at the two parking positions respectively. According to formula (3),
the actual correction value of sp can be calculated:
In the formula, sd is the distance between two parking positions: Abs is the absolute value operation: N is the
encoder count value when there are two parking positions.

In this way, the initial sp value is first set according to the given design parameter value, and then the value is
corrected according to the actual operating conditions, which can effectively ensure the accuracy of position
calculation. At the same time, sp” can also be substituted into formula (2), and the D value can be obtained in turn,
which can be used as a basis for judging whether the liner is seriously worn.

After obtaining the elevator position value, the speed control curve can be calculated according to formula (4):

VIBRO-METER  VM600 IOCR2 CPUR2
VIBRO-METER  VM600 IOCR CPUR
VIBRO-METER  VM600 IOC8T
VIBRO-METER  VM600 IOCT4
VIBRO-METER  VM600 CPUR2
VIBRO-METER  VM600 CPUR
VIBRO-METER  VM600 AMC8
VIBRO-METER  VM600 CPUM
VIBRO-METER  VM600 XMC16
VIBRO-METER  204-100-000-012/5/1/0/1/3
VM9301008 MEGGITT
vibro-meter 254-609-000-S016
Vibro-Meter 200-500-110-014
Vibro-meter P/N200-582-500-021
Vibro-Meter 204691000021s
Vibro-Meter 200-595-046-114 VM600
Vibro-Meter VM600  200-530-025-014
Vibro-Meter 200-565-013
Vibro-Meter VMF-IOC16T-V013
A-B  2711P-B4C20D
A-B  1394C-SJT22-C-RL
ABB  3BSE050200R1
ABB  PM866
ABB  PM866 3BSE050200R1
ABB    CPU  3BHE022291R0101
ABB    CPU  PCD230A101
ABB  PCD230A101 3BHE022291R0101
Vibro-Meter 200-566-000-112
Vibro-Meter 200-560-000-112
vibro-meter  204-656-000-1301
vibro-meter LM2540
Vibro-Meter 200-530-026-014
Vibro-meter 200-560-000-011
vibro-meter 234-103-000-301
Vibro-Meter IQS648 204-648-000
Vibro-Meter 200-570-000-111
Vibro-meter   VM600 200-566-000-013
Vibro-meter   PDV754 P/N 254-754-000-70 2
Vibro-meter   UVC656 13-01
Vibro-meter   608 224-607-011-02
Vibro-meter   200-595-067-114
Vibro-meter   VM600 209-500-100-027
Vibro-meter   Vm600 200-582-200-013
Vibro-meter   VM600 200-582-500-013
Vibro-meter   VM600 200-560-000-019
Vibro-meter   VM600 204-040-100-012
Vibro-meter   VM600 200-595-046-114
Vibro-meter   VM600 200-566-000-012

Reviews

There are no reviews yet.

Be the first to review “3BHB021400R0002 Контроллер ABB”

Your email address will not be published. Required fields are marked *