Sale!

1TGE120021R0110 Контроллер ABB

Original price was: $1,888.00.Current price is: $1,688.00.

Модель1TGE120021R0110

Первоначальная гарантия на один год.
1TGE120021R0110 Параметры

1TGE120021R0110 Размер 30 * 20 * 30
1TGE120021R0110 Вес 2 кг

Контактное лицо: г – н Рай

WeChat: 17750010683

WhatsApp: + 86 177500 10683

Электронная почта 3221366881@qq.com

Category:

Description

1TGE120021R0110 Контроллер ABB
1TGE120021R0110 Контроллер ABB
1TGE120021R0110 Контроллер ABB Product details:

1TGE120021R0110 Technical Manual
1TGE120021R0110 instructions
1TGE120021R0110 PDF
1TGE120021R0110 Weight:1.8KG
1TGE120021R0110 Size: 20* 38 * 30cm
1TGE120021R0110Основанная в 1988 году, Asibronbrfary Corporation (ABB) является известной крупной швейцарской многонациональной компанией со штаб – квартирой в Цюрихе,
Швейцария, и входит в десятку крупнейших швейцарских транснациональных корпораций.1TGE120021R0110
Компания Accibronburfary является одной из крупнейших в мире компаний, производящих промышленные, энергетические и автоматизированные продукты. перерабатывающая промышленность:
химическая, нефтехимическая, фармацевтическая, целлюлозно – бумажная, нефтепереработка; Оборудование приборов: электронные приборы, телевизоры и оборудование для передачи данных,
генераторы, гидротехнические сооружения; Каналы связи: интегрированные системы, системы сбора и распространения;1TGE120021R0110Строительная промышленность: коммерческое и промышленное строительство.
В период с 2015 по 2016 год объем продаж компании Axibronburfary достиг 32 миллиардов долларов. На фондовых биржах Цюриха, Стокгольма и Нью – Йорка.
Contact person: Mr. Lai
Mobil:17750010683
WeChat:17750010683
WhatsApp:+86 17750010683

ABB completed commissioning of Maritime Link and officially delivered the power interconnection project
ABB has completed the commissioning of Maritime Link and officially handed over the power interconnection
project to Emera, a leading energy and services company headquartered in Eastern Canada.
The MariTIme Link power interconnection made history on December 8, 2017, with the first power exchange
between Newfoundland and Nova Scotia. It entered service on January 15, 2018, as ABB continues to work
with Emera and the provincial system operators during initial operations.

The Maritime Link is a 500-megawatt high-voltage direct current link that enables clean, renewable energy
produced in Newfoundland and Labrador to
be transmitted to Nova Scotia”s North American grid, reducing reliance on fossil fuels. The robust nature of
ABB”s solution will also enable Nova Scotia to integrate other renewable energy sources, such as wind energy,
and contribute to Canada”s emissions reduction efforts.

ABB officially delivers MariTIme Link power interconnection project

The lightweight HVDC technology used in the Maritime Link design is the world”s first bipolar
configuration using proven and reliable voltage source converters. This solution enhances system availability,
reduces losses and improves grid reliability, allowing power to continue to be transmitted even when a
conductor or converter is not in use. The converter station is equipped with an
advanced MACH control and protection system based on ABB Ability, which functions like the brain of the
high-voltage DC connection, monitoring, controlling and protecting cutting-edge technologies within the station,
and managing thousands of operations to ensure power reliability.
Its advanced fault levels and remote control capabilities also help protect against unexpected outages such as
lightning strikes.

“Our proven lightweight HVDC technology will enable the historic Maritime Link power interconnection
project to integrate and deliver clean renewable energy while enhancing grid stability and enabling power
sharing.” Patrick Fragman, head of ABB”s grid integration business “HVDC is a technology we have pioneered
and led and is an important part of the next phase of our strategy,
cementing our position as the partner of choice for a stronger, smarter and greener grid,” said the company.

In addition to two converter stations for ±200 kV HVDC transmission, the project scope includes two 230 kV
AC substations in Newfoundland, a 345 kV AC substation and two cables in Nova Scotia Transit station.

ABB  REF615E_E HBFHAEAGNCA1BNN1XE
ABB   NBFNAANNNDA1BBN1XF
ABB   REF620
ABB   REF620 NBFNAANNNDA1BBN1XF
ABB   REF620E
ABB   REG216
ABB   REM545AG228AAAA
ABB   REM610C55HCNN02
ABB   HCMJAEADAND2BNN1CD
ABB   REM615C_D
ABB   REM615C_D HCMJAEADAND2BNN1CD
ABB    HBMBCAAJABC1BNN11G
ABB    REM615E_1G
ABB    REM615E_1G HBMBCAAJABC1BNN11G
ABB    NAMBBABA33E5BNN1XF
ABB    REM620A_F
ABB    REM620A_F NAMBBABA33E5BNN1XF
ABB     RET650
ABB     1MRK004816-AC
ABB    RET670
ABB RET670    1MRK004816-AC
ABB REU615E_D
ABB   3BHE051476R3011
ABB   PPD517A3011
PPD517A3011 3BHE051476R3011
ABB    PPD115A102
ABB    3BHE017628R0102
3BHE017628R0102 PPD115A102
ABB    3BHE040375R1023
ABB    PPD512A10-15000
PPD512A10-15000 3BHE040375R1023
PPD512  PPD512A10-15000 3BHE040375R1023
ABB  3BHE023584R2365
ABB  PPD113B03
PPD113B03 3BHE023584R2365
ABB   3BHE023784R1023
ABB   PPD113B01-10-150000
PPD113B01-10-150000  3BHE023784R1023
ABB    3BHE023584R2634
ABB    PPD113B03-26-100110
PPD113B03-26-100110  3BHE023584R2634
ABB   3BHE020455R0101
ABB   PPD103B101
3BHE020455R0101 3BHE02384R2630
PPD103B101  3BHE02384R2630
PPD103B101  3BHE020455R0101
PPD103B101  3BHE020455R0101  3BHE02384R2630
ABB  3BHE023584R2365
ABB  PPD113-B03-23-111615 3BHE023584R2365
ABB  PPD113-B03-23-111615
ABB  3BHE023784R1023
ABB  PPD113B01-10-150000
ABB  PPD113B01-10-150000 3BHE023784R1023
ABB  3BHE023584R2625
ABB  PPD113B03-26-100100
ABB  PPD113B03-26-100100 3BHE023584R2625
ABB   3BHE017628R0102
ABB   PPD115A102   3BHE017628R0102
ABB   PPD115A102
ABB   3BHE040375R1023
ABB   PPD512A10-150000 3BHE040375R1023

Reviews

There are no reviews yet.

Be the first to review “1TGE120021R0110 Контроллер ABB”

Your email address will not be published. Required fields are marked *